Lab News

January 2026

We kicked off the semester with a lab dinner. Great to see everyone back from break!

December 2025

Our article was featured as a cover article in Advanced Functional Materials

A person wearing gloves handling a flexible electronic circuit with multiple small components and conductive traces.

September 2025

Six students standing in front of a brick wall with a sign that reads 'The John & Joan Bollier Family Center for Integrated Science & Engineering'.

Welcome to the Fall 2025 team! What an amazing group of students.

Empty science classroom with tables, stools, cabinets, a fume hood, and shelves, ready for students.

August 2025

Construction on the lab is completed, just in time for the Fall semester!


Students walking and studying outside the John A. Johann Loan Center and Science & Engineering building on a college campus during late afternoon.

July 2025

Our new lab facilities are under construction in the Bollier Center, slated for completion by Sep 1!